What Facilities Managers Should Actually Specify in an Electrical SLA

An electrical SLA should define the sites, risks, cover periods, responsibilities and evidence requirements. Use the examples below to discuss a suitable contract with the contractor; they are not verified local response standards or a current JP Electrical offer.

Illustrative response bands to negotiate

The following bands are illustrative contract-planning examples, not verified local standards or a JP Electrical service offer. Set priorities through a site risk assessment and agree achievable attendance targets, cover periods, escalation and exceptions with the contractor. Immediate danger requires prompt safety action; an attendance target is not permission to leave danger in use.

  • Critical incidents: agree an urgent escalation and attendance target appropriate to the risk, site and emergency arrangements. A 60-minute target is an illustrative negotiation example only.
  • Critical service interruption: a four-hour target may be discussed as an illustrative SLA option, subject to risk assessment and contractor agreement.
  • Non-critical faults: a 24-hour target may be discussed as an illustrative option where the condition has been assessed as safe pending attendance.
  • Planned remedial work: agree a date appropriate to the risk and any inspection-report deadline. Seventy-two hours and the next working day are different periods; specify which is intended.

If service credits are appropriate, agree their triggers, exclusions and evidence requirements in the contract. Credits are a negotiated commercial term.

What an on-call rota actually looks like

The biggest gap between SLA wording and SLA reality is the on-call rota. Ask for it in writing:

  • Named engineers per shift block, not “the duty team”.
  • Geographic coverage map — which engineers cover which postcodes, and what the maximum drive time is at 3am.
  • Escalation tree — what happens if the primary on-call doesn’t answer within 10 minutes.
  • Holiday cover protocol — Christmas Eve at 11pm is the test, not a Tuesday in March.

If the contractor’s answer is a call-handler who emails the engineer in the morning, you don’t have an emergency electrical SLA — you have an answering service.

Documentation deliverables per call-out

Every attended incident should produce a packet, not a phone summary:

  • Time-stamped attendance log (request received / on-site / works complete).
  • Make-safe certificate where any C1 was isolated.
  • Minor Works Certificate (MWC) or EIC where new work was carried out.
  • Photo evidence of the fault and the rectification.
  • Remedials log with target date for any deferred work.

Check the evidence requirements of the particular insurance policy and claim. A contractor’s standard reporting pack cannot guarantee acceptance by an insurer or loss adjuster.

PPM cadence that fits the 5-yearly EICR cycle

Reactive call-outs are the obvious part of an FM electrical contract. The PPM cadence is the part that quietly compounds:

  • Annual: Emergency lighting test, RCD trip test, fire-alarm electrical compliance.
  • Annual or quarterly: Thermographic survey on main distribution boards in high-load assets.
  • 5-yearly: Full EICR per dwelling / commercial unit, building-wide where appropriate.
  • Event-driven: Pre- and post-tenant-fit-out inspection, change-of-tenant supply review.

Agree notice periods for visits, access and reminders in the maintenance plan, with a process for rescheduling and documenting any delay.

What to do next

If you are planning an electrical SLA for a managed portfolio, discuss the sites, risks, coverage periods and reporting requirements with JP Electrical & EV Solutions. Any template, response target, escalation route and maintenance schedule must be confirmed in a written proposal.

Request a free, no-obligation SLA review via our commercial property electrical services page, or read more about our 24/7 emergency electrician service in Leeds.

FAQ

How should response targets be agreed?
Consider the risk, site, coverage period and available resources. Agree achievable attendance targets and escalation procedures in writing. The examples above are negotiation examples rather than verified industry standards.

Should an electrical SLA include service credits?
They may be negotiated as part of the contract. Agree the triggers, evidence, exclusions and consequences in the written terms.

Can one contractor coordinate reactive and planned work?
Confirm the contractor’s capacity and competence for the required scope. If several contractors are used, agree how records and remedial responsibilities will be coordinated.